Discover Top-Rated Products from Amazon

TBJEN Contemporary S-Curved Sofa and Table Set, Modular Lounge Furniture for Reception, Hotel Lobby, Corporate Waiting Area, Commercial Decor(D)

$13,345.65

Added to wishlistRemoved from wishlist 0
Add to compare
Category:

Price: $13,345.65
(as of Feb 01, 2026 00:55:23 UTC – Details)


Innovative S-shaped streamlined design – Breaking away from traditional straight-line layouts, the elegant curved lines promote natural social interaction while maximizing space utilization efficiency.
High-end commercial-grade construction – Utilizing a reinforced metal frame, high-density resilient foam, and durable commercial-grade fabrics, ensuring durability for long-term, high-frequency use.
Modular and flexible configuration – S-shaped modules can be flexibly combined or used separately to adapt to waiting areas of different sizes and layouts.
Intelligent integrated coffee table design – Streamlined built-in or matching coffee tables provide convenient storage space while maintaining overall design consistency and aesthetics.
Ready-to-use professional appearance – Pre-assembled or easy-to-assemble design, with detailed installation instructions, quickly create a professional-grade reception and waiting environment.

TBJEN Contemporary S-Curved Sofa and Table Set, Modular Lounge Furniture for Reception, Hotel Lobby, Corporate Waiting Area, Commercial Decor(D)
TBJEN Contemporary S-Curved Sofa and Table Set, Modular Lounge Furniture for Reception, Hotel Lobby, Corporate Waiting Area, Commercial Decor(D)

$13,345.65

Thrifty Coupon Deals
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart